![]()
The Chartered institution of
Building Services Engineers Product Data Template |
Gas Booster | |||
Template Category | Gas Booster and Compressor | |||
Template Version | v1 | |||
Category Description | A mechanical device that increases the pressure of gas by reducing its volume, used for heaters and boilers | |||
Classification | Pr_65_53_86_33 | |||
Classification System | Uniclass2015 | |||
Suitability for Use | Approved | |||
Template Custodian | CIBSE | |||
Information Category | Parameter Name | Value | Units | Notes |
Manufacturer Data | ||||
COBie Data | Manufacturer | Text | This is a COBie field, other fields will be required in final PDTs |
|
Specifications | Manufacturer Website | URL | ||
Specifications | Product Range | Text | ||
Specifications | Product Model Number | Text | Or Code |
|
Specifications | CE Mark | Text | Number, Yes, No |
|
Specifications | Product Literature | URL | ||
COBie Data | Features | Text | This is a COBie field, other fields will be required in final PDTs |
|
Construction Data | ||||
Specifications | Type | Enumeration | This is a COBie field, other fields will be required in final PDTs |
|
COBie Data | Shape | Enumeration | This is a COBie field, other fields will be required in final PDTs |
|
Specifications | External Material | Enumeration | This is a COBie field, other fields will be required in final PDTs |
|
COBie Data | Colour | Text | This is a COBie field, other fields will be required in final PDTs |
|
COBie Data | Finish | Text | This is a COBie field, other fields will be required in final PDTs |
|
Specifications | Drive Type | Enumeration | ||
Specifications | Inlet Connection Type | Enumeration | ||
Specifications | Outlet Connection Type | Enumeration | ||
Specifications | Enclosure Rating | Text | IP rating, e.g. IP65. |
|
Dimensional Data | ||||
Specifications | Overall Length | mm | Or Diameter. Minimum and maximum lengths available |
|
Specifications | Overall Width | mm | Minimum and maximum widths available |
|
Specifications | Overall Height | mm | Minimum and maximum heights available |
|
Specifications | Gross Weight | kg | Equates to Operating Weight |
|
Specifications | Shipping Weight | kg | Equates to dry weight of unit plus packaging allowance |
|
Specifications | Access Clearance Top | mm | Access required for maintenance of this item |
|
Specifications | Access Clearance Bottom | mm | Access required for maintenance of this item |
|
Specifications | Access Clearance Left | mm | Access required for maintenance of this item |
|
Specifications | Access Clearance Right | mm | Access required for maintenance of this item |
|
Specifications | Access Clearance Front | mm | Access required for maintenance of this item |
|
Specifications | Access Clearance Rear | mm | Access required for maintenance of this item |
|
Specifications | Inlet Connection Size | Range:Minimum.,,Maximum. |
||
Specifications | Outlet Connection Size | Range:Minimum.,,Maximum. |
||
Performance Data | ||||
Specifications | Fuel Type | Enumeration | ||
Specifications | Maximum Gas Flow | Nm3/h | ||
Specifications | Minimum Gas Flow | Nm3/h | ||
Specifications | Maximum Gas Pressure Increase | mbar | ||
Specifications | Maximum Gas Inlet Pressure | mbar | Maximum safe gas inlet pressure. If Not Applicable Mark '0' |
|
Specifications | Minimum Gas Inlet Pressure | mbar | ||
Electrical Data | ||||
Specifications | Voltage | V | ||
Specifications | Supply Phase | Number | 1, 3 |
|
Specifications | Frequency | Hertz | eg. NA, DC, 50,60, Other, UserDefined |
|
Specifications | Starting Current | A | ||
Specifications | Full Load Current | A | At UK standard voltage |
|
Specifications | Fuse Rating | A | At UK standard voltage |
|
Specifications | Control Circuilt | Y/N | ||
Specifications | Control Voltage | V | ||
Specifications | Control Frequency | Hertz | eg. N/A, DC, 50,60, Other, UserDefined |
|
Specifications | Control Current | A | ||
Specifications | Control Fuse Rating | A | ||
Specifications | Maximum Power Consumption | W | ||
Specifications | Minimum Power Consumption | W | ||
Application Data | ||||
Specifications | Reference Standard | Text | ||
Controls | ||||
Specifications | Controls Type | Enumeration | ||
Specifications | BMS Links | Y/N | ||
Specifications | Interlocks | Y/N | ||
Sustainability | ||||
Sustainable Material BREEAM etc | Embodied Carbon | kgCO2e | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Life Cycle Analysis | Number | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Location of Manufacturer | GridRef | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Green Guide for Specification | Text | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Environmental Product Declaration | Text | 3rd Party Verification |
|
Sustainable Material BREEAM etc | Responsible Sourcing of Materials | Text | Awaiting Industry Standard |
|
Sustainable Material ETL | Energy Technology List | URL | Hyperlink to ETL webpage for product |
|
Sustainable Material LEED v.4 | Responsible Extraction of Materials | Text | Awaiting Industry Standard |
|
Sustainable Material LEED v.4 | Material Ingredient Reporting | Text | Awaiting Industry Standard |
|
Operations & Maintenance | ||||
Facilities/Asset Management | Operation and Maintenance Manual | URL | Hyperlink to Manufacturer O&M Data |
|
Facilities/Asset Management | Daily | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | Weekly | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | Monthly | Text | Maintenance tasks or SFG20 codes. If Not Applicable Mark '0' |
|
Facilities/Asset Management | Quarterly | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | 6 Monthly | Text | ||
Facilities/Asset Management | Annually | Text | ||
Facilities/Asset Management | Bespoke Timeframe | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | Maintenance Required 0 to 300hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 301 to 600hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 601 to 1000hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 1001 to 2000hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 2001 to 4000hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 4001 to 8000hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Maintenance Required 8001 to 12000hrs | Text | Maintenance tasks required during this time frame |
|
Facilities/Asset Management | Expected Life | Years | ||
Facilities/Asset Management | Warranty ID | Text | ||
This schedule is the property of CIBSE although it can be freely used in the ways described, and completed with data specific to particular products. It is important that the Categories and Parameters given on the form are not changed. It is also important that where units of measurement are defined on the form that these too are followed. Any comment or suggestion on their revision should be addressed to pdt@cibse.org |
||||
©CIBSE 2015
©The Chartered Institution of Building Services Engineers www.cibse.org
|