![]()
The Chartered institution of
Building Services Engineers Product Data Sheet |
PDS-Cavity-Floor-Grommet-Electrak-Aluminium Access v1.1 | |||
Template Category | Cavity Floor Grommet | |||
Template Version | v1 | |||
Category Description | Cavity/Raised Floor Grommet usually for Power, Data, Comms or Access | |||
Classification | Pr_65_72_97_52 | |||
Classification System | Uniclass2015 | |||
Suitability for Use | Approved | |||
Template Custodian | CIBSE | |||
Information Category | Parameter Name | Value | Units | Notes |
Manufacturer Data | ||||
COBie Data | Manufacturer | Legrand Electric Ltd | Text | Head Office address: Great King Street North, Birmingham, B19 2LF |
Specifications | Manufacturer Website | https://www.legrand.co.uk/ | URL | |
Specifications | Product Range | Floor grommets | Text | Electrak Access, Power and Data Grommets. |
Specifications | Product Model Number | EG0015 | Text | Please refer to literature |
Specifications | CE Mark | Yes | Text | Number, Yes, No |
Specifications | Product Literature | https://www.legrand.co.uk/medi | URL | |
COBie Data | Features | Quick fit installation | Text | Secured by quarter turn fasteners |
Construction Data | ||||
Specifications | Type | Access | Enumeration | Access grommets allow cables and conduit to link underfloor power & desk power |
COBie Data | Shape | Round | Text | This is the general shape |
Specifications | Compartments | Access | Enumeration | Access grommets do not have compartments |
Specifications | Outlet Plates | No | Enumeration | Not applicable |
COBie Data | Material | Aluminium | Text | Body - cast aluminium. Lid - injection moulded plastic Nylon 66 |
Specifications | Material for Base Box | Text | Not applicable |
|
COBie Data | Colour | Grey | Text | to BS 4800 18B25 |
COBie Data | Finish | Powder coated | Text | This denotes the final finish for the product |
Specifications | Adjustable Depth | N | Y/N | No adjustment depth |
Dimensional Data | ||||
Specifications | Overall Length | 144 | mm | Overall diameter of the grommet, including the carpet lip / trim |
Specifications | Overall Width | 0 | mm | Not applicable |
Specifications | Overall Height | 60 | mm | Overall height of the grommet |
Specifications | Diameter | 127 | mm | Overall diameter of the grommet (approx), excluding the carpet lip / trim |
Specifications | Gross Weight | 1 | kg | Equates to Operating Weight |
Specifications | Shipping Weight | 1 | kg | Equates to dry weight of unit plus packaging allowance |
Specifications | Access Clearance Top | 0 | mm | Access required for maintenance of this item |
Specifications | Access Clearance Bottom | 0 | mm | Access required for maintenance of this item |
Specifications | Access Clearance Left | 0 | mm | Access required for maintenance of this item |
Specifications | Access Clearance Right | 0 | mm | Access required for maintenance of this item |
Specifications | Access Clearance Front | 0 | mm | Access required for maintenance of this item |
Specifications | Access Clearance Rear | 0 | mm | Access required for maintenance of this item |
Specifications | Depth Adjustment Range | 0 | mm | Not applicable |
Specifications | Floor Cut Out Diameter | 127 | mm | Diameter of hole required to fit grommet |
Specifications | Accessory Clearance | 0 | mm | Not applicable |
Performance Data | ||||
Specifications | Maximum Plate Load | 0 | kg | Not applicable |
Specifications | Maximum Point Load | 0 | kg | |
Application Data | ||||
Specifications | Reference Standard | IEC61534 | Text | Manufactured in accordance with IEC 61534-22:2014 Particular requirements for powertrack systems intended for onfloor or underfloor installation |
Sustainability | ||||
Sustainable Material BREEAM etc | Embodied Carbon | 0 | kgCO2e | Awaiting Industry Standard |
Sustainable Material BREEAM etc | Life Cycle Analysis | 0 | Number | Awaiting Industry Standard |
Sustainable Material BREEAM etc | Location of Manufacturer | GridRef | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Green Guide for Specification | Enumeration | Awaiting Industry Standard |
|
Sustainable Material BREEAM etc | Environmental Product Declaration | Yes | Text | 3rd Party Verification |
Sustainable Material BREEAM etc | Responsible Sourcing of Materials | Enumeration | Awaiting Industry Standard |
|
Sustainable Material ETL | Energy Technology List | https://etl.decc.gov.uk/engetl | URL | Hyperlink to ETL webpage for product |
Sustainable Material LEED v.4 | Responsible Extraction of Materials | Text | Awaiting Industry Standard |
|
Sustainable Material LEED v.4 | Material Ingredient Reporting | Text | Awaiting Industry Standard |
|
Operations & Maintenance | ||||
Facilities/Asset Management | Operation and Maintenance Manual | https://www.legrand.co.uk/medi | URL | Hyperlink to Manufacturer O&M Data |
Facilities/Asset Management | Daily | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | Weekly | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | Monthly | Text | Maintenance tasks or SFG20 codes. If Not Applicable Mark '0' |
|
Facilities/Asset Management | Quarterly | Text | Maintenance tasks or SFG20 codes |
|
Facilities/Asset Management | 6 Monthly | Text | ||
Facilities/Asset Management | Annually | Text | ||
Facilities/Asset Management | Bespoke Timeframe | Facilities routine maintenance schedule | Text | Maintenance tasks or SFG20 codes |
Facilities/Asset Management | Expected Life | 0 | Years | Dependent upon installation location |
Facilities/Asset Management | Warranty ID | Refer to Legrand Terms and Conditions | Text | https://www.legrand.co.uk/media/4391/pdbu-legrand-tcs-012016.pdf |
This schedule is the property of CIBSE although it can be freely used in the ways described, and completed with data specific to particular products. It is important that the Categories and Parameters given on the form are not changed. It is also important that where units of measurement are defined on the form that these too are followed. Any comment or suggestion on their revision should be addressed to pdt@cibse.org |
||||
©CIBSE 2015
©The Chartered Institution of Building Services Engineers www.cibse.org
|