The Chartered institution of
Building Services Engineers
Product Data Sheet
Test
Template Category Gas Booster and Compressor
Template Version v1
Category Description A mechanical device that increases the pressure of gas by reducing its volume, used for heaters and boilers
Classification Pr_65_53_86_33
Classification System Uniclass2015
Suitability for Use Approved
Template Custodian CIBSE
Information Category Parameter Name Value Units Notes
Manufacturer Data
COBie Data Manufacturer Test Text
This is a COBie field, other fields will be required in final PDTs
Specifications Manufacturer Website https://www.bimhawk.co.uk/pds. URL
Specifications Product Range Test Text
Specifications Product Model Number Test Text
Or Code
Specifications CE Mark Test Text
Number, Yes, No
Specifications Product Literature https://www.bimhawk.co.uk/pds. URL
COBie Data Features Test Text
This is a COBie field, other fields will be required in final PDTs
Construction Data
Specifications Type Other Enumeration
This is a COBie field, other fields will be required in final PDTs
COBie Data Shape Cylindrical Enumeration
This is a COBie field, other fields will be required in final PDTs
Specifications External Material Aluminium Enumeration
This is a COBie field, other fields will be required in final PDTs
COBie Data Colour Test Text
This is a COBie field, other fields will be required in final PDTs
COBie Data Finish Test Text
This is a COBie field, other fields will be required in final PDTs
Specifications Drive Type Belt-driven Enumeration
Specifications Inlet Connection Type Plain Enumeration
Specifications Outlet Connection Type Plain Enumeration
Specifications Enclosure Rating 12 Text
IP rating, e.g. IP65.
Dimensional Data
Specifications Overall Length 12 mm
Or Diameter. Minimum and maximum lengths available
Specifications Overall Width 12 mm
Minimum and maximum widths available
Specifications Overall Height 12 mm
Minimum and maximum heights available
Specifications Gross Weight 12 kg
Equates to Operating Weight
Specifications Shipping Weight 12 kg
Equates to dry weight of unit plus packaging allowance
Specifications Access Clearance Top 12 mm
Access required for maintenance of this item
Specifications Access Clearance Bottom 12 mm
Access required for maintenance of this item
Specifications Access Clearance Left 12 mm
Access required for maintenance of this item
Specifications Access Clearance Right 12 mm
Access required for maintenance of this item
Specifications Access Clearance Front 12 mm
Access required for maintenance of this item
Specifications Access Clearance Rear 12 mm
Access required for maintenance of this item
Specifications Inlet Connection Size 12 mm
Range:Minimum.,,Maximum.
Specifications Outlet Connection Size 12 mm
Range:Minimum.,,Maximum.
Performance Data
Specifications Fuel Type LPG Enumeration
Specifications Maximum Gas Flow 12 Nm3/h
Specifications Minimum Gas Flow 12 Nm3/h
Specifications Maximum Gas Pressure Increase 12 mbar
Specifications Maximum Gas Inlet Pressure 12 mbar
Maximum safe gas inlet pressure. If Not Applicable Mark '0'
Specifications Minimum Gas Inlet Pressure 12 mbar
Electrical Data
Specifications Voltage 12 V
Specifications Supply Phase 12 Number
1, 3
Specifications Frequency 12 Hertz
eg. NA, DC, 50,60, Other, UserDefined
Specifications Starting Current 12 A
Specifications Full Load Current 12 A
At UK standard voltage
Specifications Fuse Rating 12 A
At UK standard voltage
Specifications Control Circuilt Y Y/N
Specifications Control Voltage 12 V
Specifications Control Frequency 12 Hertz
eg. N/A, DC, 50,60, Other, UserDefined
Specifications Control Current 12 A
Specifications Control Fuse Rating 12 A
Specifications Maximum Power Consumption 12 W
Specifications Minimum Power Consumption 12 W
Application Data
Specifications Reference Standard 12 Text
Controls
Specifications Controls Type Internal Enumeration
Specifications BMS Links Y Y/N
Specifications Interlocks Y Y/N
Sustainability
Sustainable Material BREEAM etc Embodied Carbon 12 kgCO2e
Awaiting Industry Standard
Sustainable Material BREEAM etc Life Cycle Analysis 12 Number
Awaiting Industry Standard
Sustainable Material BREEAM etc Location of Manufacturer 12 GridRef
Awaiting Industry Standard
Sustainable Material BREEAM etc Green Guide for Specification 12 Text
Awaiting Industry Standard
Sustainable Material BREEAM etc Environmental Product Declaration 12 Text
3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials 12 Text
Awaiting Industry Standard
Sustainable Material ETL Energy Technology List https://www.bimhawk.co.uk/pds. URL
Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials 12 Text
Awaiting Industry Standard
Sustainable Material LEED v.4 Material Ingredient Reporting 12 Text
Awaiting Industry Standard
Operations & Maintenance
Facilities/Asset Management Operation and Maintenance Manual https://www.bimhawk.co.uk/pds. URL
Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily 12 Text
Maintenance tasks or SFG20 codes
Facilities/Asset Management Weekly 12 Text
Maintenance tasks or SFG20 codes
Facilities/Asset Management Monthly 12 Text
Maintenance tasks or SFG20 codes. If Not Applicable Mark '0'
Facilities/Asset Management Quarterly 12 Text
Maintenance tasks or SFG20 codes
Facilities/Asset Management 6 Monthly 12 Text
Facilities/Asset Management Annually 12 Text
Facilities/Asset Management Bespoke Timeframe 12 Text
Maintenance tasks or SFG20 codes
Facilities/Asset Management Maintenance Required 0 to 300hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 301 to 600hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 601 to 1000hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 1001 to 2000hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 2001 to 4000hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 4001 to 8000hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Maintenance Required 8001 to 12000hrs 12 Text
Maintenance tasks required during this time frame
Facilities/Asset Management Expected Life 12 Years
Facilities/Asset Management Warranty ID 12 Text
 
This schedule is the property of CIBSE although it can be freely used in the ways described, and completed with data specific to particular products.
It is important that the Categories and Parameters given on the form are not changed. It is also important that where units of measurement are defined on the form that these too are followed.
Any comment or suggestion on their revision should be addressed to pdt@cibse.org
©CIBSE 2015
©The Chartered Institution of Building Services Engineers www.cibse.org